
🔑 Logged in as ****
Perform structural engineering analysis and design for the building.
STATUS: Complete
PROJECT
ASSIGNEE
CATEGORY
Engineering
PRIORITY
Medium
BUDGET
$ 1.5M
START
2023-11-16
DURATION
45 days
DAYS UNTIL DEADLINE
0 DAYS
ESTIMATED END DATE
2023-12-31
ACTUAL END DATE
2023-10-06
DAYS OVERDUE
DAYS
Available: 1 | In use: 2 | Scheduled: 0
Available: 1 | In use: 4 | Scheduled: 0